Primary bathroom · before → completed

Primary Bathroom Transformation

A dated bathroom rebuilt around a larger walk-in shower, marble-look tile, black fixtures, glass, a new vanity, and an illuminated mirror.

Completed primary bathroom with walk-in shower, white vanity, and illuminated mirror.
Completed primary bathroom

The starting point

Remove the tub. Rebuild the room around the shower.

The existing tub-and-shower layout gave way to a larger walk-in shower. The project direction centered on large-format marble-look tile, black fixtures, a glass enclosure, a recessed niche, a redesigned vanity, and an illuminated mirror.

Primary bathroom before remodel with the existing tub and shower.
Before · existing tub and shower

Before → completed

The transformation is the proof.

Authentic Built By Alvarez project photography shows the original tub-and-shower starting point and the completed bathroom without fabricating construction-stage imagery.

Primary bathroom before remodel with the existing tub and shower.
Before
Completed primary bathroom with walk-in shower, white vanity, and illuminated mirror.
Completed
Tub removalWalk-in showerLarge-format tileBlack fixturesNicheGlass enclosureVanityIlluminated mirror
Completed walk-in shower with marble-look tile, black fixtures, and glass enclosure.
Finished shower detail

Finished detail

Tile, glass, black fixtures, and the niche read as one finished composition.

The result stays focused on the completed space rather than inventing a construction story that was not photographed.

Related work

Planning a project with similar scope?